× Projects Services About us News Career Contacts
EN EN LT LT SE SE

Youtube LinkedIn FB
search
Contact us

If you have any questions regarding construction or general contracting project implementation or cooperation, please do not hesitate to contact us. Our specialists will respond in no time.

Information by telephone: +370 5 260 0356



Send
close
Search
Customer: Fire and Rescue Department
Commencement of construction works: August 2012
Duration of construction works: 16 months
Total area: 2273,07 sq. m.
ABOUT THE PROJECT
Finished

Fire rescue training center

Conresta general contractor has completed the construction of firefighter special physical and vocational training complex in the former 44,2878 ha Soviet army rocket fuel base, situated in Valčiūnai village, Vilnius district.

The complex consists of:

  • A 2273,07 sq. m. one-storey building with a basement and a superstructure for the technical facilities, which accommodates the inter-detached multipurpose halls, a swimming pool and other facilities including technical and ancillary facilities for firefighters’ training and exercise.
  • Sports facilities including a football field, running tracks, basketball and tennis courts, platforms and a tower for firefighters training. The maximum area for activities without protective areas is 19.5 x 39 m. The size of protective areas corresponds with the sports requirements. The football field is covered with a natural lawn, while the running tracks and courts are covered with a synthetic cover. The training tower construction is made of galvanized steel grid covered with rain resistant panels. The 300-seat reinforced concrete audience platforms are protected from the rain.
  • The building is equipped with a two-track 25 m long and 6 m the depth swimming pool. The depth ranges from 1.5 m to 6 m.  
  • A decompression chamber for the medical care, treatment, and training of divers.
  • A paved entrance road, an open 10-place parking lot and sidewalks.
  • Engineering constructions and networks, as well as a 500 cubic meter capacity filtering reservoir for rainwater collection in the southern part of the plot.
Dalintis:
INTERACTIVE PROJECT'S MAP
Baigtas Vykdomas

OTHER PROJECTS

Baigtas Vykdomas
Finished

Reconstruction of Vilnius French High School



UAB Conresta reconstructed the building of Vilnius French High School, as well as built a new 1200 sq. m wing....

Reconstruction of Vilnius French High School

read more
Finished

Transformation of garage to fire and rescue station



In spring 2014 Conresta completed the construction of Fire and Rescue Station at the International Vilnius Airport. The total area of the three-storey 14 m. high building is 1511 sq. m. The...

Transformation of garage to fire and rescue station

read more
Finished

Reconstruction of Medininkai border checkpoint



Conresta carried out the construction works of the border checkpoint in Medininkai, the town on the Lithuanian border with the Republic of Belarus. The objective of the reconstruction was to increase...

Reconstruction of Medininkai border checkpoint

read more
Finished

Vilnius International Airport business club interior construction and renovation



In October Conresta general contracting and construction company completed interior renovation works of the business club in the departure area of Vilnius International Airport. A new...

Vilnius International Airport business club interior construction and renovation

read more
Finished

Reconstruction of Eišiškės Border Checkpoint – the first reverse border checkpoint in Lithuania



Conresta construction company has completed the building of the first reverse operating border checkpoint in Lithuania, featuring an administrative building, a passenger hall, the facilities for...

Reconstruction of Eišiškės Border Checkpoint – the first reverse border checkpoint in Lithuania

read more
Finished

Hospital Reconstruction



Conresta general contracting and construction company completed the reconstruction of Medical Centre of the Ministry of Interior.After the reconstruction the building was adapted to the needs of...

Hospital Reconstruction

read more
Finished

Construction of Alytus back-to-back HVDC station and a 400 kV open switchyard



In 2015 Conresta construction company has implemented a strategic power project – the new LitPolLink power interconnection between Lithuania and Poland, connecting the power infrastructures of...

Construction of Alytus back-to-back HVDC station and a 400 kV open switchyard

read more
Finished

Renovation of Fire and Rescue Department building, block II



One of the largest construction companies in Lithuania - Conresta - has won the tender announced by the Fire and Rescue Department to carry out construction works of the building located on...

Renovation of Fire and Rescue Department building, block II

read more
Finished

Construction of SPA Vilnius Anykščiai



SPA VILNIUS is the first modern wellness and treatment SPA centre in Anykščiai, which meets the international SPA classification standards and can successfully compete with Central and Eastern...

Construction of SPA Vilnius Anykščiai

read more
Finished

Palanga Concert Hall



Conresta general contracting and construction company was entrusted with the reconstruction of Palanga Summer Concert Hall, which involved works ranging from demolishing to presenting the client with...

Palanga Concert Hall

read more
In progress

Seaside project – the construction of a swimming-pool and a health centre



In December 2016, one of the largest construction companies in Lithuania – Conresta –  signed the contract with Palanga City Municipality regarding the construction of a swimming-pool...

Seaside project – the construction of a swimming-pool and a health centre

read more
Finished

Reconstruction of the historical palace of the Pac family and the construction of a 5 star hotel



In a unique building of cultural heritage, located in Vilnius Old Town, near the beautiful Rotushes square, we have built and opened a luxury hotel – the 5-star “Archer Mansion...

Reconstruction of the historical palace of the Pac family and the construction of a 5 star hotel

read more
Finished

Shelter of the Fire and Rescue Department



Conresta general contracting and constructions company has implemented the project of the shelter of the Fire and Rescue Department under the Ministry of Interior. ...

Shelter of the Fire and Rescue Department

read more
Finished

Conresta constructions company reconstructed Birštonas Vyturėlis nursery



At the end of November this year Conresta general contracting and constructions company has completed the reconstruction of Birštonas Vyturėlis nursery. The company has implemented general...

Conresta constructions company reconstructed Birštonas Vyturėlis nursery

read more
Finished

General construction of Nemenčinė clinic



Conresta general contracting and constructions company has implemented general construction and some interior renovation works of Nemenčinė clinic. ...

General construction of Nemenčinė clinic

read more
Finished

Reconstruction of the sports hall of the rehabilitation hospital and the construction of physiotherapy department



Conresta has completed the reconstruction of the sports hall of the Children's Department at Abromiškės Rehabilitation Hospital and the construction of the physiotherapy block. During the...

Reconstruction of the sports hall of the rehabilitation hospital and the construction of physiotherapy department

read more